Engineering & Drainage Permits
Download Engineering & Drainage Permits from this area.Asset Protection Permit Application
An Asset Protection Permit may be required when undertaking building works.
An Asset Protection Permit may be required when undertaking building works.
Building Over Easement Application
An application for Building Over Easement is required for any Building or Structure that is to be errected over a Drainage Easement.
An application for Building Over Easement is required for any Building or Structure that is to be errected over a Drainage Easement.
Legal Point of Discharge
An application for the Stormwater Legal Point of Discharge is required for new building works or drainage improvement works.
An application for the Stormwater Legal Point of Discharge is required for new building works or drainage improvement works.
Road Opening Permit Application
A Road Opening Permit is required when any Council assets are to be opened, e.g. water main connections, underground power etc.
A Road Opening Permit is required when any Council assets are to be opened, e.g. water main connections, underground power etc.
Stormwater Drainage On-Site Detention (OSD) Guidelines
Council has established a set of guidelines regarding the stormwater discharge from existing and proposed residential, commercial, industrial and subdivisional developments within the municipality.
Council has established a set of guidelines regarding the stormwater discharge from existing and proposed residential, commercial, industrial and subdivisional developments within the municipality.
Stormwater Inspection within Title Boundary form
Please complete this form only if you are connecting your storm water to a council drain that is within your property boundary.
Please complete this form only if you are connecting your storm water to a council drain that is within your property boundary.
Stormwater within the Road Reserve
Complete these forms when connecting stormwater to a barrel drain, kerb and channel or laneway (Outside the property boundary / Council land).
Complete these forms when connecting stormwater to a barrel drain, kerb and channel or laneway (Outside the property boundary / Council land).